PRODUCT INSTALLATION
Dual Temperature Model Installation
5. Install the hot water supply cap
a. If you are only connecting the cold
water supply, then you must install the
hot water supply cap (provided - see
Page 5) over the hot water connection
on your bidet (see diagram).
b. After installing hot water cap, proceed
to "Installing the Bidet Attachment" on
Page 10. If you wish to connect your
hot water supply, proceed to the next
steps.
Step 5a
IMPORTANT: Failure to connect or
cap the hot water supply will result in
leaking during use.
6. Disconnect the hot water supply
a. Locate the hot water supply line
in your bathroom under your sink/
washbasin and turn the water supply
valve all the way off.
b. Drain the hot water line by turning the
sink tap on the hot setting until no
more water comes out.
c. Disconnect hot water supply hose to
sink from shut-off valve. You may have
to use a 3/8" compatible wrench or a
similar tool (not supplied).
Step 6c
8
NOTE: There may be some residual
water in the hose; use a small container
or towel to catch any residual water.
7. Install the hot water ⅜" T-Valve and the
small rubber washers as needed onto the
hot water shut-off valve under the sink
8. Reconnect hot water supply line to open
end (top) of T-Valve
Steps 7,8
9. If not already removed, unscrew the
pressure cap covering the pressure
connector on the T-Valve
a. Slide the pressure cap over the open
end of the of hot water flex tubing
with the inside threads facing towards
the open end.
Step 9a
b. Push the hot water flex tubing over the
pressure connector.