USER GUIDE - VELTIUM LITE
SCHEDULING
This screen enables you to view and manage the charger schedule. The possible functions are:
ENABLE/DISABLE SCHEDULE: Use the selector on the right of each schedule to
enable/disable it. You can enable multiple schedules at the same time provided that they
are not incompatible: if you enable a schedule which is incompatible with another that has
already been enabled, the oldest of the two will automatically be disabled.
DELETE SCHEDULE: Press the
ADD SCHEDULE: Pressing the
can define a new schedule. The steps to follow are:
q Select the days of the week to which the daily charge period will apply.
q Select the daily charge period on the selection dial and check the
the selected period involves a change of day, it will end on the following day.
q Select the
q Press the
Once you have enabled a
operation:
Your vehicle will only charge on the days and periods defined. If you need different charge
•
periods for different days of the week you will have to create several schedules.
If you connect the vehicle to the charger at a time other than the daily charge period, the charger
•
status will indicate CONNECTED, although the vehicle won't charge until the start time
commences, when the charger will indicate that it is CHARGING.
If you connect the vehicle to the charger within the daily charge period, the charger status will be
•
CHARGING and will stay that way (unless the batteries are fully charged) until the end of said
charge period, when the charger status will once again change to CONNECTED.
icon to delete the schedule.
Add Schedule
Maximum charge power
Confirm
button to save the defined schedule.
schedule, you must take the following into account regarding its
button will take you to the screen on which you
for this period.
Start
and
End
values. If
EN
27