7.1 Maintenance plan
i
Before beginning service, disconnect from power. The work area around the lift is to be secured against unautho-
rised use.
Visual
Spray
inspection
Time frame
Position
Type of
maintenance
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
365 x / 12
9
3
4
8
7
5
6
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
OPI-POWER LIFT HF 3S 3000-4000-V4.0-DE-EN-FR-ES-IT
Oil
Lubricate
The lift cylinder can sweat and small oil droplets can form on the base plate,
this is however, not a leak.
Model and information signs, labels, brief operating instructions, safety stick-
ers and warning information are to be cleaned and exchanged if damaged.
Check CE-stop for function. Exchange if damaged
The rubber acceptance plate is to be checked for wear and replaced if neces-
sary.
Check the tracks and the lift rail equalization parts for wear. After cleaning,
grease with multi-purpose grease. We exclusively recommend that MO-2 high
performance lubricating grease is used. (available for purchase directly from
Oest).
Check the lifting arm block and gear for wear. Exchange if there is visible
damage.
Clean with
Clean
compressed
air
Maintenance plan
Inspect
97