Descargar Imprimir esta página

Argo ISIDE Instrucciones De Uso página 24

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PRE-OPERATING CHECKS AND OPERATIONS
The following space must be maintained to ensure the operating efficiency of the portable air conditioner.
Open the packaging and pull out the box. Remove the product and the other elements supplied (illustrated in the box
below).
Infrared remote control
Flexible pipe inclusive of fitting for unit and end
fitting for window
Position the product vertically on a flat and stable surface, as close as possible to a window and at least 50 cm from
walls or other nearby obstacles.
V 12/20
50 cm
APPLIANCE START-UP
Type-AAA – LR03 – 1.5 V
batteries for remote control.
(Not provided)
Round fitting for window unit, to
be positioned between the end
of the tube and the window unit
itself
50 cm
Window unit kit with plug.
24

Publicidad

loading