INSTALLATION
7 INSTALLATION
!
C A U T I O N
Transport the products as close as possible to the place to be installed
before unpacking.
Do not put any material on the product.
!
D A N G E R
Install the device with enough clearance and space around it
for operation and maintenance.
Install the YUTAKI CASCADE CONTROLLER where good
ventilation is available
Do not install the YUTAKI CASCADE CONTROLLER where there
is a high level of oil mist, salty air or sulphurous atmosphere.
Install the unit as far as practical (being at least 3 meters) from
electromagnetic wave radiator (such as medical equipment).
For cleaning, use noninflammable and nontoxic cleaning liquid.
Use of inflammable agent should cause explosion or fire.
7.1 FIX THE UNIT TO THE WALL
The YUTAKI CASCADE CONTROLLER is a simple-to-install
device. To make this operation even simpler, the YUTAKI
CASCADE CONTROLLER disposes of 4 key slots to ease the
operation of fixing to a wall.
!
C A U T I O N
Place the unit on a resistant wall
7.1.1 Dimensional for the installation to a wall
Ø6
Ø 11
11
4
PMML0581 rev.1 - 02/2023 - 1000011627
330.4
11
Work with sufficient ventilation. Working in an enclosed space
should cause oxygen deficiency. Toxic gas should be produced
when cleaning agent is heated to high temperature by, e.g.,
being exposed to fire.
Cleaning liquid shall be collected after cleaning.
Pay attention not to clamp cables when attaching the service
cover to avoid electric shock or fire.
!
C A U T I O N
Install the device in the shade or not exposed to direct sunshine or
direct radiation from high temperature heat source.
The device installation and connections must be performed by
qualified professionals and following the local directives.
Check to ensure that the field supplied electrical components
(mains power switches, circuit breakers, wires, connectors and wire
terminals) have been properly selected according to the electrical
data indicated on this document and they comply with national and
local codes. If it is necessary, contact with your local authority in
regards to standards, rules, regulations, etc.
7.1.2 Notes for installation
The YUTAKI CASCADE CONTROLLER is designed in a way
that wiring must be route through the bottom side of the unit.
Rubber bushing have been placed for such purpose. After
routing the cables through the rubber bushing, the cables should
be placed in a simple manner inside the Electrical box, so the
identification should be easy and at first sight. Additionally,
cables should be fixed to the plastic cord located inside the
Electrical box, before the TB1.
Rubber bushing for power
supply wiring routing
Rubber bushing for
control wiring routing (x2)

Publicidad