Evaporative Cooling System
Pad Assembly Instructions
(NOTE: THE EVAPORATIVE COOLING MEDIA SHOULD MATCH SYSTEM CHARACTERISTICS)
BEFORE BEGINNING, MAKE SURE PADS ARE ORIENTED CORRECTLY. REFERENCE CAN BE
24. Begin on either end of the system by placing the Evaporative Cooling Pads into the channel on the
Trough Cover against the End Panel.
25. Insert Evaporative Cooling Pad into Trough Cover channel for the length of the system ensuring pads are
compacted against each other
26. With roughly 3 feet of void remaining, place Evaporative Cooling Pad against remaining End Panel.
27. Continue placing Pad until void is filled. If necessary, cut a remaining pad to size to complete filling void.
28. Capture pad with Pad Retainer, Splice, and Wing Nuts. Repeat for length of system.
29. Finally, on each end of the system capture with end panel clips.
30. Finally install rubber end cap on end of the system away from the sump tank.
Hog Slat Inc. Newton Grove, NC USA February 2019
FOUND ON SIDE OF COOLING PADS.