Descargar Imprimir esta página

Miele PWM 511 Plano De Instalación página 27

Ocultar thumbs Ver también para PWM 511:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 64
Levelling the machine
Align the washing machine vertically and horizontally using the ad-
justable feet and a spirit level.
The washing machine must stand evenly and horizontally on all four
feet to ensure trouble-free and energy-efficient operation. Otherwise
the water and energy consumption increases and the washing ma-
chine might move around.
After aligning the machine, tighten the lock nuts by turning them in
a counterclockwise direction with a spanner. This will prevent the
feet from adjusting themselves.
Electrical connection
The electrical connection must only be carried out by a qualified
electrician who must ensure that all electrical work is carried out in
accordance with applicable electrical regulations and standards
(BS 7671 in the UK).
This washing machine must be connected to an electrical mains
supply that complies with local and national regulations. Please also
observe your insurance and energy supplier's regulations as well as
any health and safety at work regulations.
The required voltage, connected load and fusing rating can be
found on the data plate on the washing machine. Before connecting
the machine to the power supply, please ensure that the mains sup-
ply voltage complies with the values given on the data plate.
Connection to a supply voltage other than the one quoted on the
data plate can lead to functional faults and damage the washing
machine!
If more than one voltage is quoted on the data plate, the washing
machine can be converted for connection to the voltages stated.
Conversion to a different voltage must only be carried out by a
Miele Service engineer or by an authorised Service Partner. The wir-
ing instructions given on the wiring diagram must be followed.
en - Installation notes
27

Publicidad

loading