Descargar Imprimir esta página

Miele PWM 511 Plano De Instalación página 42

Ocultar thumbs Ver también para PWM 511:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 64
en - Technical data
Plumbing
Cold water connection
Required flow pressure
Maximum flow rate
Threaded union required (male thread, to be provided by customer in accordance with
DIN 44991, flat sealing)
Length of water inlet hose included in scope of supply
Hot water connection
Maximum permissible hot water temperature
Required flow pressure
Maximum flow rate
Threaded union required (male thread, in accordance with DIN 44991, flat sealing)
Length of water inlet hose supplied
Drain valve (DV)
Maximum waste water temperature
Drain connection (on machine)
Drain (on site)
Maximum drainage rate
Drainage (DP)
Maximum waste water temperature
Drain connection (on machine)
Maximum drainage rate
Equipotential bonding
Connection with male thread
Washers and nuts
If local and national installation specifications require equipotential bonding, good galvanic contact must be guaranteed. Accessories
for equipotential bonding are not supplied and need to be ordered separately.
Installation dimensions
Casing width (without add-on components)
Casing height (without add-on components)
Casing depth (without add-on components)
Overall machine width
Overall machine height
Overall machine depth
Minimum width of transport opening
Minimum safety distance between wall and back of machine
Diameter of door opening
Door opening angle
42
100 - 1000 kPa (1 - 10 bar)
10 l/min
3/4"
1550 mm
70 °C
100 - 1000 kPa (1 - 10 bar)
10 l/min
3/4 "
1550 mm
95 °C
Plastic pipe HT DN 70
Connection DN 70
200 l/min
95 °C
External diameter 22 (DN 22)
26 l/min
10×35 mm
M10
692 mm
1012 mm
818 mm
700 mm
1020 mm
845 mm
800 mm
400 mm
370 mm
180°

Publicidad

loading