Descargar Imprimir esta página

Sime SOLIDA 5 PL Manual Del Usuario página 14

Ocultar thumbs Ver también para SOLIDA 5 PL:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 18
the hub (9) with the screws (8) and the
nuts (7); block the front grid from the
right side of the boiler body with the
screws (5).
– Hook the tie rod (6) to the seats
extracted from the front and rear grid.
– Place the intermediate grids (11).
– Introduce the ring (4) and the lever (3)
on the hub (9), fixing then everything
with the washer (2) and the screw (1).
1.2.5
ASSEMBLY OF THE
ACCESSORIES
The closing handles for the ports and the
screw with the adjustment knob for the
blast gate damper are supplied sepa-
rately, since they could be damaged dur-
ing the transport.
Both the handles and the screws with
knob are packed in a nylon bag, intro-
duced inside the ash collection basin.
For the assembly of the handles proceed
as following (fig. 4):
– Take a handle (1), insert it in the open-
ing of the load port (2) and introduce
the roll (3) in the opening of the han-
dle; block the handle introducing the
elastic split pin (4).
– Carry out the same operation for the
handle of the ash box port.
To assemble the screw with the knob,
proceed as follows (fig. 5):
– Remove the screw M8 x 60, which
fixes the air blast damper to the ash
box port and screw the screw with the
bakelite knob (1) on, which is supplied
in the packaging.
Place the blind nut with cap (2) at the
end of screw M 10.
– Fix lever M6 to the air blast damper
(3) placing it in a horizontal direction
on the right. The lever has an opening
at its end, where the chainlet of the
thermostatic regulator will be con-
nected.
1.2.6
CASING ASSEMBLY
Two superior tie rods are screwed on
three nuts at the front side of the boiler:
the second and the third nut serve to
place correctly the lateral sides of the
casing.
Two nuts one to fix the clamp holders
for the lateral sides are screwed on the
14
LEGEND
1
Handle
2
Load port
3
Roll
4
Elastic split pin
inferior tie rods, both from the front side
and from the rear side of the boiler. The
assembly of the casing components has
to be carried out in the following way
(fig. 6):
– Unscrew with some rotations the sec-
ond or third nut of each tie rod.
– Hook the left side (1) on the lower
tie rod and superior of the boiler and
adjust the position of the nut and lock-
nut of the upper tie rod.
– Fix the lateral side in blocking the
locknut.
– In order to assembly the right side (2)
proceed in the same way.
– Hook the front upper board (3) intro-
ducing the two splines in the opening,
obtained on each side.
– Carry out the same operation to fix the
back lower board (4).
– The protection deflector (5) is fixed to
the control board (6) with three self-
threading screws.
Fix the board by means of the pressure
stakes.
Then unwind the capillary of the ther-
mometer and introduce it in the left
sheath of the posterior head, introduc-
ing the contact spring.
The right sheath can be needed for the
check thermometer.
– Fix the cover (7) at the lateral sides of
the boiler.
NOTE: Keep the "Test certification"
together with the boiler documents in
Fig. 4
LEGEND
1
Screw with knob M10 x 70
2
Blind nut with cap
3
Blast gate damper
the combustion chamber.
1.2.7
DRAUGHT REGULATOR
The boilers "SOLIDA PL" can assemble
indifferently 2 types of thermostatic regu-
lators.
NOTE: In order to fix the lever with the
chainlet in the regulator holder it is nec-
essary to remove the deflector in alu-
minum, which is assembled on the control
board, by unscrewing the three screws
that fix it (fig. 6). Replace the protec-
tion deflector after the assembling and
related adjustment.
"THERMOMAT RT-C" Regulator
The "Thermomat" regulator is equipped
with a thermosetting resin knob of an
adjustment field from 30 to 100 °C (fig.
7).
Screw the regulator on the 3/4" opening
of the anterior head and orientate the red
index on the upper part.
LEGEND
1
Left side
2
Right side
3
Posterior superior board
4
Posterior inferior board
5
Protection deflector
6
Control board
7
Cover
Fig. 5
Fig. 6

Publicidad

loading

Este manual también es adecuado para:

Solida 8 pl+80585408075742