Descargar Imprimir esta página

Bruno SRE-2010 ELITE Manual De Instalación página 30

Ocultar thumbs Ver también para SRE-2010 ELITE:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
BATTERY CHARGER INSTALLATION
charger power switch
© BRUNO INDEPENDENT LIVING AIDS, INC.®
1. Secure charger in chosen location by
2. Connect power cord to nearest wall/floor
Fig. 1
3. Connect battery charger output harness
4. Cable tie adapter wires to rail charge
5. Bundle together loose wires.
6. Turn ON the charger power switch (Fig. 3).
NOTES: If batteries become discharged,
Fig. 2
Fig. 3
30
inserting two (2) provided screws through
mounting holes in charger base (Fig. 1).
NOTE: There are two (2) mounting
holes on each side of charger
base. Choose one of the two
on each side.
outlet.
to rail charge connector using provided
adapter (Fig. 2).
connector.
carriage will move more slowly
until voltage drops to a point
where controller will shut off.
If this happens, pause, then run
carriage "down" until it engages
charge contacts.
Partially charged batteries will
run carriage "down", but not
"up".
Confirm that charger is plugged
into a "live" outlet and wait for
batteries to recharge.
SRE-2010 INSTALLATION 02-08-2019

Publicidad

loading

Este manual también es adecuado para:

2010-i