■
Open the box and check unit in area with good ventilation (open
the door and window) and without ignition source.
Note: Operators are required to wear anti-static devices.
■
It is necessary to check by professional whether there is
refrigerant leakage before opening the box ; stop installing the
air conditioner if leakage is found.
■
The fire prevention equipment and anti-static precautions shall
be prepared well before checking.Then check the refrigerant
pipeline to see if there is any collision traces, and whether the
outlook is good.
Safety Principles for Installing Air Conditioner
■
Fire prevention device shall be prepared before installation.
■
Keep installing site ventilated. (open the door and window)
■
Ignition source, smoking and calling is not allowed to exist in area
where R290 refrigerant located.
■
Anti-static precautions in necessary for installing air conditioner,
e.g. wear pure cotton clothes and gloves.
■
Keep leak detector in working state during the installation.
■
If R290 refrigerant leakage occurs during the installation, you
shall immediately detect the concentration in indoor environment
until it reaches a safe level. If refrigerant leakage affects the
performance of the unit, please immediately stop the operation,
and the unit must be vacuumed firstly and be returned to the
maintenance station for processing.
■
Keep electric appliance, power switch, plug, socket, high
temperature heat source and high static away from the area
underneath sidelines of unit.
■
The unit shall be installed in an accessible location to
installation and maintenance, without obstacles that may block
air inlets or outlets of units, and shall keep away from heat
source, inflammable or explosive conditions.
Notice of lnstallation
Unpacking Inspection
44