Descargar Imprimir esta página

Kohler K-1173-GCR-96 Guía De Instalación Y Cuidado página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

Second Junction Box
Ground (Green with
Cable to
Yellow Stripe)
Blower
Motor
Black
Blue
7. Install the Blower Cord at the Control - Remote Site
Install the Second Junction Box on the Control
Install a second junction box with external bonding lug, two strain reliefs, and a cover (not
supplied) on the blower adapter board on the control.
Connect a solid copper 8-gauge bonding wire from the bonding lug on the new junction box to the
spare bonding lug on the control. Follow all local electrical codes.
Reconnect the Blower Motor Power Cord
If required, reconnect the blower motor power cord at the control.
Route the blower motor power cord through a strain relief on the second junction box. Tighten the
strain relief.
At the end of the cut power cord, strip back the cable jacket about 3" (76 mm).
Strip about 3/8" (10 mm) of wire insulation from the remaining control wires.
Reconnect the Blower New Power Cable
Route the customer-supplied power cable from the blower through the other strain relief on the
second junction box. Tighten the strain relief.
Strip back the cable jacket about 3" (76 mm).
For installations in the USA, mark the white wire with either red or black electrical tape as required
by the National Electric Code.
Use approved termination devices to terminate the conductors as follows:
• Connect the black pigtail lead to the L1 conductor of the power cable.
• Connect the blue pigtail lead to the L2 or N conductor of the power cable.
• Connect the green with yellow stripe pigtail lead to the grounding or earthing conductor of the
power cable.
Install the cover on the new junction box.
8. Complete the Installation
Test Run the Bath
Fill the bath to a level at least 4" (102 mm) above the top of the highest airjet.
Turn off the bath and let sit for five minutes. Check all bath piping connections for leaks. Check for
leakage along the front, sides, and back of the bath.
Kohler Co.
Strip back the jackets about
3" (76 mm) on the field cable
and on the blower motor pigtail.
Wire Nut
From Control
60 Hz
50 Hz
From Control
L1
L1
Black
L2
N
Blue
Green w/Yellow Stripe
GND
GND
Control Power Junction Box
Blower Adapter
Board
New Field
Cable To
Blower Motor
Route the cut end of the cord to
the new junction box. Add strain relief.
11
Blower
Motor Pigtail
Second
Junction Box
Install junction box with cover
and bonding lug (not provided).
1199249-2-D

Publicidad

loading

Este manual también es adecuado para:

K-1173-g-96