Descargar Imprimir esta página

Kohler K-1173-GCR-96 Guía De Instalación Y Cuidado página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Level by fitting metal shims
under the feet.
2. Install the Bath
WARNING: Risk of personal injury. This cast iron bath is extremely heavy. Obtain sufficient help
to carefully lift and move it.
Carefully move the bath into position.
Level the bath by fitting metal shims under the feet as needed. Check for level along the rim. Make
sure the bath is resting on all four feet.
Cut the Banding Straps
IMPORTANT! This step is necessary to make the bath operate more quietly.
Cut the two banding straps from the blower.
Install the Plumbing
Insert the drain tailpiece into the trap. Secure the drain tailpiece to the trap.
Install the faucet valve.
Check the drain connections for leakage.
1199249-2-D
Blower
Motor
Cut the banding
straps.
6
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-1173-g-96