Descargar Imprimir esta página

Fimar FNT Uso Y Mantenimiento página 18

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 43
Packing and unpacking
The machine is packaged in cardboard with polyester
foam inserts to guarantee full integrity during transport.
Handle the packaging according to the instructions.
Open the packaging and check the integrity of all
components. Keep packaging for future moves.
Lift the machine as indicated and place it in the
installation area.
Installation area
The arranged area must be suitably illuminated and an electrical socket must be available. The resting
surface must be sufficiently ample, even and dry. The machine must be installed in rooms with non-explosive
environments. In any case, installation must also be performed in consideration of the work safety laws in
force.
Room conditions table
Descriptions
Working temperature
Storage temperature
Relative humidity
Dustiness
Electrical connections
DANGER – WARNING: Electrical connections to
the supply mains must be performed by specialised
Verify the efficiency of the grounding system in the building. Make
sure that line voltage (V) and frequency (Hz) correspond to those
of the machine (See the identification plate and wiring diagram).
The machine is equipped with an electrical cord that connects to a
multi-polar plug. The plug is to be connected to a wall switch
equipped with a circuit breaker.
Three phase connection
Start the machine and run for several seconds to make sure the
upper tool rotates correctly. If this is not the case, disconnect the
power supply and invert two of the three phases in the plug.
Maximum 80% with 20 °C room temperature
Maximum 50% with room temperature between 20÷60 °C
personnel.
INSTALLATION
INFORMATION
Values
0÷35 °C (32÷95 °F)
-15 to +65 °C (from –6.8 to +149 °F)
Less than 0.03 g/m³
Single phase
230V – 1Ph
2
Three phase
230/400V – 3Ph/3Ph+N

Publicidad

loading

Este manual también es adecuado para:

Fnt 2v