Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
Commissioning
Shelves and supports
The shelves and their supports are secured inside the
incubator for transport. The transport guards must be
removed before the incubator is put into operation.
The shelf supports can be inserted at random in the
perforated carrier racks. The shelves slide over the
supports in such a way that the fork-shaped stabilizer
catches the lower side of the support.
The working space proper is defined as that space which is
1/10 less than the overall chamber of the respective
incubator (cf. also DIN-Standard 12 880, Part 2).
Only this portion ot the chamber may be loaded.
Do not load the bottom of the incubator!
Turn on the master switch.
- The green pilot lamp lights up.
Set the temperature controller to the desired working
temperature.
After the desired temperature has been reached, set the
temperature safeguard.
50012338
- 21 -

Publicidad

loading

Este manual también es adecuado para:

B 6030B 6060B 6120B 6200B 6420B 6760