Descargar Imprimir esta página

Gree U-match GUD35ZD/A-T Manual Del Propietário página 60

Publicidad

Idiomas disponibles

Idiomas disponibles

DC Inverter U-match Series Floor Ceiling Type Unit
maintenance and service guidelines shall be followed. If in doubt consult the
manufacturer's technical department for assistance.
The following checks shall be applied to installations using flammable
refrigerants:
(1) The charge size is in accordance with the room size within which the
refrigerant containing parts are installed;
(2) The ventilation machinery and outlets are operating adequately and are not
obstructed;
(3) If an indirect refrigerating circuit is being used, the secondary circuit shall be
checked for the presence of refrigerant;
(4) Marking to the equipment continues to be visible and legible. Markings and
signs that are illegible shall be corrected;
(5) Refrigeration pipe or components are installed in a position where they are
unlikely to be exposed to any substance which may corrode refrigerant
containing components, unless the components are constructed of materials
which are inherently resistant to being corroded or are suitably protected
against being so corroded.
5.4.1.9 Checks to Electrical Devices
Repair and maintenance to electrical components shall include initial safety
checks and component inspection procedures. If a fault exists that could
compromise safety, then no electrical supply shall be connected to the circuit
until it is satisfactorily dealt with. If the fault cannot be corrected immediately but
it is necessary to continue operation, an adequate temporary solution shall be
used. This shall be reported to the owner of the equipment so all parties are
advised.
Initial safety checks shall include:
(1) That capacitors are discharged: this shall be done in a safe manner to avoid
possibility of sparking;
(2) That no live electrical components and wiring are exposed while charging,
recovering or purging the system;
(3) That there is continuity of earth bonding.
56

Publicidad

loading