ProCore Edge North America
Figure 1 Side-to-Side Airflow Design, Top View........................... 7
Figure 2 Standard Side-to-Side Charger Spacing ........................ 7
Figure 3 Side-to-Side Charger Spacing with Dividers .................. 8
Figure 4 Offset 45-degree Angle Charger Installation .................. 8
Figure 5 Attaching Points for M8 Lifting Eye-bolts,
Top-panel View ........................................................... 10
Figure 6 Charger, Wall, Wall-Mount Hanger, Bottom Bracket,
and Screw with an M6 Thread .................................... 11
Figure 7 Charger on the Wall-Mount Hanger ............................ 11
Figure 8 Bottom Bracket Mounted to the Charger with a
Tightening Torque of 52.22 in.-lb. (5.9 N-m) ............... 11
Figure 9 Floor Stand .................................................................. 12
Figure 10 Predrilled Holes for Bolting the Base to the Floor ....... 13
Figure 11 Pogo Stick (Optional) Attached to the Pogo Bracket .. 13
Figure 12 Charger Hung on the Floor Stand .............................. 14
Figure 13 Bottom Bracket Mounted to the Charger and
Floor Stand with a Tightening Torque of
52.22 in.-lb. (5.9 N-m) ............................................... 15
31241-03-0202 Page vi of viii
Figures
Webasto Charging Systems, Inc.
IOMM