Activating; Deactivating; Taring The Torque Tester - Gedore Dremotest E 8612-012 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 23
ONLY connect the power unit to the power network if the
power unit voltage and power unit frequency specified agree
with the supply voltage and supply frequency of the power
network.
ONLY connect undamaged power units and supply lines to
the torque tester.
NEVER cover power units that are connected.

3.3.1 Activating

Attach the power unit connection cable
to the torque tester. Then plug the
power unit into the socket.
The torque tester activates
automatically at this stage.
Automatic taring follows.
The unit is ready for use when the
value " 0 0 0 0 " (with decimal point
depending on the model) is displayed.

3.3.2 Deactivating

To deactivate the torque
tester, first unplug the power
unit from the socket.
Then remove the power plug
connection cable from the
torque tester.
3.4

Taring the Torque Tester

Once the torque tester is activated, " 0 0 0 0 " appears in the
display. If the torque tester displays a different value in the
unloaded state, the torque tester has to be tared again.
For this purpose, pull the power plug and wait at least
5 seconds before plug in again. The torque tester will begin
the automatic taring process again.
EN
14

Publicidad

Tabla de contenido
loading

Tabla de contenido