TRAPP TRF 50 Manual De Instrucciones página 55

Trituradores forrajeros
Ocultar thumbs Ver también para TRF 50:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

www.trapp.com.br
Models TRF 300G
1. Belt protection guard
2. Grain funnel
3. Green crop feeder
4. Cover
5. Lower downward exit
6. Counter cutting blade
All TRAPP shredders, single-phase or three-


phase, are assembled with double voltage motors.
They leave factory without electrical connection
to allow the customer to choose the kind of
connection based on the voltage of their property
power source , (except TRF 400, which leaves
factory with voltage already selected).
The same is not true for shredders TRF 60, TRF 70,


TRF 80 and TRF 80M, which are equipped with a
127/220V voltage selection switch.
To correctly make the connection, see data shown


on the motor plate and the number printed on the
insulation of the wires.
For shredders sold without motor, the choice of


minimum output shall follow the technical data
shown on pg. 50.
7
10
1005
1005
Motor Installation
6
4
8
1
5
9
7. Grain input adjuster
8. Body
9. Universal mounting base
10. Green crop feeder cover
11. Cushion rubber
Attention!
Before making any connections, make
sure power source is disconnected.
1. Make sure the power source where the
shredder will be installed is compatible with
the data shown on the motor plate.
2. Disconnect the power source to make motor
connections.
3. Make the connections shown according to
the voltage of the power source.
4. Use insulating tape in the connections done
to protect them.
5. Make sure the connections are well
insulated.
6. Turn on power source and check the rotation
of the shredder.
2
3
11
619
619
55

Publicidad

Tabla de contenido
loading

Tabla de contenido