Descargar Imprimir esta página

Thermador Masterpiece Serie Guia De Instalacion página 17

Ocultar thumbs Ver también para Masterpiece Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Standard installation - Triple oven
*Junction box location: above, left or right of the unit within
reach of the flexible conduit.
Control panel overlap: min. 3/8" (10mm) to max. 2"
(51mm).
Flush mount installation - Triple oven
Flush installation requires two side cleats to be attached
inside the cabinet frame, recessed from the front.
Top view bottom hinged door
Reveal cleats
Flush inset depth
Side view
Reveal cleats
Flush cutout height
6 Prior to installation
Prior to installation
Carry out these steps to prepare your appliance for
Prior to installation
installation.
6.1 Lifting the appliance
Follow these recommendations to prevent injury and
damage to the appliance during lifting.
CAUTION
DO NOT attempt to lift the unit by holding the oven's upper
heating element.
Prior to installation en-us
17

Publicidad

loading