Maintenance documentation
Interval
Weekly
Inspection/activity
Check electrical func-
tions of cooling system,
clean evaporator.
Responsibility
Electrician
Date
Company & name
Signature
Date
Company & name
Signature
Date
Company & name
Signature
Date
Company & name
Signature
Date
Company & name
Signature
Date
Company & name
Signature
Date
Company & name
Signature
Copy this template for your documentation.
Every 3 months
Annually
Check cooling capacity
Check the entire unit for
and temperature.
distortion and mechan-
ical damage, the effec-
tiveness of the locks,
the mechanical strength
of the wheels and the
functionality of the cen-
tral locks.
Refrigeration specialist
Maintenance engineer
Annually
Annually
Check electrical protec-
Carry out DGUV V3
tive conductor (VDE
measurement for
0701): Limit value
mobile operating equip-
for the protective
ment.
conductor resistance
< 100 mΩ
Electrician
Electrician
Annually
Annually
Check cooling con-
Check documentation.
troller.
Reset maintenance
interval.
Refrigeration specialist
Operator