Descargar Imprimir esta página

LiftMaster myQ Business CAP2D Manual De Instalación página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

INTRODUCTION
4
Mount the Bracket
1.
Install an electrical box in the desired mounting location.
INTRODUCTION
NOTE: Use 4" square electrical box (minimum of 1 1/2" deep) with a single-gang plaster ring. Use Wiremold
BW35 for surface-mount installations.
2.
Remove the bracket from the back of the CAP2D.
3.
Mount the bracket to the electrical box.
4.
Run all wiring to the electrical box.
INTRODUCTION
5.
Once all the wiring is completed, position the CAP2D in the bracket and secure it at the bottom with the provided screw.
INTRODUCTION
INTRODUCTION
PRE-INSTALL
WIRING
PRE-INSTALL
WIRING
PRE-INSTALL
WIRING
Bracket
PRE-INSTALL
WIRING
PRE-INSTALL
WIRING
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
Electrical Box
9
INSTALL
INSTALL
V5744S or
®
INSTALL
INSTALL
INSTALL

Publicidad

loading