Descargar Imprimir esta página

Zoeller 104 Instrucciones Para La Instalación página 7

Ocultar thumbs Ver también para 104:

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 5
NOTE: External plumbing configuration will vary depending on the location of basin, location of main stack and
available space.
5.1)
Place the pump in the basin as shown in Figure 5.1.
NOTE: If installing the internal trap, rotate the tail pipe to the orientation shown in Figure 5.1.
5.2)
Install the lid components as shown in Figure 5.2.
NOTE: Pull excess cordage through the opening and install the cord seal as shown in Figure 5.3A.
Insure o-ring is in the cap before installation.
5.3)
Place the basin assembly in its final position and complete plumbing. Secure all connections
(shown in 5.3A or 5.3B).
KEY
Figure 5.1
UNION
(PURCHASED SEPARATELY)
INLET
CORD SEAL
GFCI
OUTLET
CAP
STEP 6
6.1)
Plug the cord into a properly grounded GFCI receptacle.
6.2)
Fill tank with water.
6.3)
Check all plumbing for leaks as the basin fills.
6.4)
Verify that the pump starts and stops.
6.5.)
Check the discharge line for leaks as the pump empties the basin.
6.6.)
Repeat steps 6.2 to 6.5 as necessary to insure proper operation.
6.7.)
If problems persist, refer to the troubleshooting guide located on page 2 of this manual.
Final Assembly
TRAP INLET
SK2005
DISCHARGE PIPE
CHECK VALVE
INTERNAL TRAP INSTALLATION
Figure 5.3A
Initial Testing of Drain Basin System
© Copyright 2023 Zoeller
2" SLP x NPT
CORD SEAL
SEE NOTE
O-RING
CAP
UNION
(PURCHASED SEPARATELY)
CAP
CORD SEAL
*
INLET
GFCI
OUTLET
*
CHECK VALVE MUST BE
PURCHASED SEPARATELY
FOR MODEL 104 & 132-0005.
Co. All rights reserved.
®
7
1-1/2" SLP x NPT
(APPLY SEALANT TO THREADS)
1/4-20 x 1-1/8"
S.S. SCREWS
DISCHARGE PIPE
1/4-20
S.S. NUTS
(TORQUE TO 35 IN-LB)
Figure 5.2
DISCHARGE PIPE
CHECK VALVE
STANDARD INSTALLATION
Figure 5.3B
SK2007A
*
SK2006

Publicidad

loading

Este manual también es adecuado para:

105106110115120131