Descargar Imprimir esta página

Waeco ASC 6300 G Instrucciones De Uso página 10

Estacion de mantenimiento de aire acondicionado
Ocultar thumbs Ver también para ASC 6300 G:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN    
17
Container for fresh oil
18
Container for UV additive (500 ml)
19
Drained oil receptacle
20
Cover flap
21
Main switch
22
Fan
12 Initial start­up
This chapter describes the procedures you have to carry out before you can operate the A/C service unit.
12.1 Setting up and switching on
Note  In order to achieve correct measurements, the A/C service unit must be placed on a level flat sur­
face during operation. Ignore any error codes which occur during commissioning (Troubleshooting on
page 37) and skip by pressing 
1. Wheel the A/C service unit to the workplace and lock the front wheels.
2. Mount the service hoses.
3. Set the length of the service hoses (Setting the length of the service hoses on page 12).
4. Connect the A/C service unit to the power supply.
5. To switch the A/C service unit on, set the main switch to 
The switch­on delay runs for 35 s and the housing is ventilated. The software version number then appears in
the display for several seconds:
10
ENTER
.
I
.

Publicidad

loading

Este manual también es adecuado para:

Asc 6400 g9103303106