5. Drive the forklift truck forwards between the rollers of the sur-
face finishing machine until they project beyond the far side.
» Take account of the centre of gravity.
6. Lift the surface finishing machine and take it off the pallet.
7. With the assistance of a second person, remove the transport
trolley from the separate package.
5.2.
AMBIENT CONDITIONS
Erect the machine only on a flat and stable surface in an en-
closed and dry area.
Allow one metre from other objects or walls on all sides of the
machine.
Ambient temperature between +5 °C and +40 °C, average at-
mospheric humidity over a year less than 65 %, average atmo-
spheric humidity over 60 days less than 85 %.
Erect the machine near to a fire extinguisher.
Do not erect it in explosion hazard areas or areas with a high
presence of dust, flammable gases, vapours, solvents or other
materials.
Do not expose it to extreme temperatures, high voltages, vi-
bration fields.
5.3.
ERECTION
A
1. Roll the surface finishing machine and transport trolley to the
place of erection.
2. Open the noise-absorption hood and remove the restraint
straps.
3. Apply the parking brakes of the surface finishing machine.
4. Position the transport trolley at the side of the surface finish-
ing machine directly under the separation unit.
5. Apply the parking brakes of the transport trolley.
5.4.
RELOCATING TO ANOTHER PLACE OF ERECTION
Safety shoes
CAUTION
Collision with the surface finishing machine or transport
trolley
Crush hazard for the body and individual limbs.
» Make sure the paths for movement and transport are clear.
» Wear safety shoes.
» No persons must be present in the direction of travel.
» Not for use in areas where the floor slopes upwards or down-
wards.
» After positioning it, lock the castors by applying the parking
brakes.
5.4.1.
Surface finishing system
ü Transport trolley removed from the surface finishing machine.
ü Cable rolled up on the cable holder at the back.
ü All flaps and openings closed.
1. Release the parking brakes on both castors.
2. Push the surface finishing machine only using the handle.
3. Once it has been positioned, lock the castors by applying the
parking brakes.
5.4.2.
Transport trolley
1. Push the transport trolley only using the handle.
2. Position it to the side of the surface finishing system directly
under the separation unit.
6.
Initial commissioning
C
Trained specialist for mechanical work and electro-tech-
nical work
Hearing protection, safety helmet
Insert the mains plug into a mains socket. Make sure the socket is
provided with a mains fuse. 1×230 V, 50 – 60 Hz, single phase,
mains fuse 10 A.
6.1.
PERFORM A TEST RUN
D
Trained specialist for mechanical work.
Hearing protection, protective gloves, safety
glasses, safety shoes.
i
A test run is mandatory before first use.
ü Secure the surface finishing machine against rolling away. Ap-
ply the parking brake to the castors to ensure this.
ü Cover at the outlet from the trough on the separation unit
closed.
1. Unlock the door for access to the water tank.
2. Using a measuring beaker, measure out the required quantity
of compound and pour it into the left unit of the water tank.
3. Pour approx 45 litres water into the left unit of the water tank.
The filling level can be read on the level display.
» The compound will mix with the water that was poured in.
Push the water tank into the surface finishing machine and lock
the door.
4. Switch on the main switch.
5. Perform a visual check of the trough and the separation unit.
Depending on the application, select appropriate abrasive chips
and fill the left hand chamber or the entire trough. Maintain a
maximum filling level 3 cm below the water outlet.
6. Select "Manual".
7. Set Speed to 1500 rpm.
8. Press
to start the motor.
9. Test the sequence of functions listed below:
Button
Press
to start the motor.
Press
to raise the Speed to
3000 rpm.
Close the trough cover and
noise-absorption hood.
Press "On >" to start the pump
Press "Off >" to stop the pump
10. Position the transport trolley with transport boxes under the
separation unit.
11. Open the side cover of the trough and remove the abrasive
chips via the separation unit.
12. Empty the container.
7.
Operation
Trained specialist for mechanical work.
Hearing protection, safety glasses, protective
gloves, safety shoes
Function to be tested
The trough should vibrate.
The vibrations in the trough
should become stronger.
Water will be delivered from the
circulation tank by two nozzles.
The delivery of water will stop.
www.hoffmann-group.com