Plumbing Connections - Ravelli RBH 150 V Manual De Uso

Ocultar thumbs Ver también para RBH 150 V:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Rev.1 14/02/18
Pag.70
EN

Plumbing connections

The heating capacity of the unit must be previously established by calculating the building's heat requirement according to current
regulations. The system must be provided with all the components for correct and regular operation; in fact according to the rules of
proper workmanship in installation, shutoff valves and non-return valves allowing the stove to be isolated in case of maintenance and/or
checks,must be interposed between the stove and the heating system.
Proceed slowly during heating chamber water filling, to allow correct and complete evacuation of the air from the vent ( for a closed vessel
system from 1.1 to 1.5 bar ).
The pellet stove has an internal heating circuit complete with circulating pump, safety valves, air vent, temperature probes and pressure
transducer.
During insert transport the gaskets in the plumbing system may come loose and/or break, causing water leaks
during normal operation; therefore make sure to check the tightness of the circulating pump and heating chamber
connection rings and vent the residual air during water filling and after the first hours of operation.
To connect the stove to a heating system it is advisable to contact a competent technician in order to best optimise
the plumbing connections and the performance of the entire system without compromising stove operation.
OUT
8
Control
IN
system
ST
SS
KEY:
1
Drain cock
2
Pressure sensor/ Pressure guage
3
3-way valve motorized*
4
Pump
5
Membrane presure vessel
6
Shutoff valve/ Cock*
Use and maintenance manual RBH 150 V- RBH 200 V
IN
4
2
SP
1
5
7
Non-return valve*
8
Circuit heating chamber air ven
9
Safety valve P max 3 bar
Safety sensor T > 85°C
SS
Water temperature sensor
ST
Circuit pressure sensor
SP
9
Ps=3bar
1 bar
F
6
A
Heating DELIVERY male
3/4- 1" - OPT
C
Sanitary DELIVERY male
3/4- 1" - OPT
3
6
A
B
E
7
6
Valves to be included in system during
installation not supplied with the unit
A
Heating DELIVERY male 3/4-
B
Heating RETURN male 3/4"
E
Water supply M1/2" Pmax 2 bar
F
Overpressure
water
F1/2"
discharge

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rbh 200 v

Tabla de contenido