Descargar Imprimir esta página

MR TAPCON 230 Manual página 42

Ocultar thumbs Ver también para TAPCON 230:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

NOTICE
42
  Initial steps 7820658/06 EN
6 Initial steps
Damage to device and system periphery!
An incorrectly connected device can cause damage to the device and system
periphery.
Check the entire configuration before commissioning.
As soon as the device has powered up and the start screen is displayed, you will
be asked to make the following settings.
6.1 Establishing connection to visualization
A connection to the visualization can be established using two interfaces:
Front interface (for local access)
Optional: Interface X3 on the rear of the device (for access via remote display,
control center etc.)
System requirements
To access the web-based visualization, you need a PC with an HTML5-capable
browser. The display is optimized for the following browsers:
Microsoft Edge
Google Chrome™
Establishing a connection via front interface
1. Remove the interface cover on the front of the device.
2. Connect the COM-X2 to the CPU-X3 using the supplied patch cable.
Figure 41: Patch cable on the rear

Publicidad

loading