Descargar Imprimir esta página

Fellowes Array AR1 Guía Para La Instalación página 3

Ocultar thumbs Ver también para Array AR1:

Publicidad

Idiomas disponibles

Idiomas disponibles

4
Pull filter out by the strap and set aside for now.
7
Lift and rotate unit before setting door-side down
on the provided trays. Determine which electrical
knockout will be used and remove it.
WARNING: do not place directly on any flat
surface as this will damage the sensor that sticks
below the bottom surface.
10
Have one person slowly lifting the machine while
the other pulls the free end of the cables to keep
them taut.
Alternate slowly raising each side to keep the
unit relatively level during lifting.
WARNING: During lifting ensure hooks stay
oriented correctly and do not get misaligned or
they may not hold properly.
5
Remove mounting hardware and verify included
part quantities.
8
Loop open end of cables through intended
support or hardware.
Use provided cable clutch hardware to secure
each cable.
11
Raise the fixture to about 1-2 feet below the
ceiling grid on the cables.
NOTE: If unit is raised too high, have one
person raise the unit while the other depresses
the spring section on the wire clutch, allowing
the cable to be loosened.
CAUTION: To reduce the risk of injury to
persons, install fan at least 2.1 m (6.9 ft)
above the floor.
6
Close the door until a click is heard. Depending on
type of ceiling, attach proper mounting hardware
above installation area per local regulations for
supporting a 52lb (24kg) fixture. Ideally the
mounting locations would be 23" apart in the shape
of a square.
9
Secure the hooks from the provided aircraft
cabling to the housing through the mounting
holes (P7).
12
If you have not yet, remove the adjacent cross-tee,
tilt fixture about 45° upward toward the grid's
long tees.
3

Publicidad

loading