Descargar Imprimir esta página

Fellowes Array AR1 Guía Para La Instalación página 4

Ocultar thumbs Ver también para Array AR1:

Publicidad

Idiomas disponibles

Idiomas disponibles

13
Rotate and lift all the way through the grid
until until fixture can be straightened above
the ceiling grid ensuring bottom panel is not
damaged.
16
Coil and wrap remaining cable out of the way.
Do not trim excess cable lengths.
Re-install the cross-tee.
17B
18
Ensure power switch located on the power supply
is in the off position before proceeding with
connecting any wires.
4
14
With one person supporting fixture so it just
touches the grid, the other should pull the aircraft
cables until taut.
WARNING: Grid is not meant to support
weight of product.
17A
Tape off the hook slots as shown.
17C
19
Black
Line
Green
Ground
White
Neutral
Have a qualified electrician connect the ground,
line, and neutral to fixture per local electrical codes.
Turn on power supply switch.
Now the unit is set up and can be controlled with
the buttons behind the filter door.
All wirings connected in junction box should be
connected with twist connectors.
15
Check below unit for visible gaps. If needed, add
centering blocks between unit and grid. Trim out
as desired.
17B
Working from above the unit, attach a
UL approved straight or 90° elbow to
connect conduit.
Unit AC Input
2
3
4

Publicidad

loading