Installing Dies In Self-Opening Die Head (Right Hand Only) - RIDGID 535 Manual De Operador

Ocultar thumbs Ver también para 535:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

535 Manual Pipe and Bolt Threading Machine
6. Insert new dies to mark on side of dies. Numbers 1
through 4 on the dies must match numbers on the
die head.
7. Slide throwout lever back so that tongue of clamp
lever washer will drop in slot under size bar.
8. Adjust die head size bar until index line on link is
aligned with proper size mark on size bar. For bolt
threads, align underline with bolt line on size bar.
9. Tighten clamp lever.
Index Line
Link
Throwout
Lever
Figure 9 – Universal Quick-Opening Die Head
10. If oversize or undersize threads are required, set
the index line in direction of OVER or UNDER size
mark on size bar.
Installing Dies in Self-Opening Die Head
(Right Hand Only)
The No. 815A Self-Opening Die Head (Figure 10) for
right-hand threads requires four sets of dies to thread
pipe ranging from
1
/
" - 2". One set of dies is required for
8
each of the following pipe size ranges: (
-
3
/
"), and (1" - 2"). Bolt threading requires a separate set
4
of dies for each bolt size.
1. Place self-opening die head on bench in vertical
position.
2. Make sure trigger assembly is released.
3. Loosen clamp lever approximately six full turns.
4. Pull lock screw out of slot under size bar so that roll
pin in lock screw will bypass slot. Position size bar so
that index line on lock screw is aligned with the end of
REMOVE DIES position.
5. Lay head down with numbers up.
6. Remove dies from die head.
10
Washer
Head
Clamp Lever
Size Bar
1
/
"), (
1
/
" -
3
/
"), (
1
/
"
8
4
8
2
Ridge Tool Company
7. Insert new dies to mark on side of dies. Numbers 1
through 4 on the dies must match numbers on the
die head.
8. Move throwout lever back to lock in dies.
9. With head in vertical position, rotate cam plate until roll
pin on lock screw can be positioned in slot under size
bar. In this position dies will lock in die head. Make
sure roll pin points toward end of size bar marked
REMOVE DIES.
10. Adjust die head size bar until index line on lock screw
or link is aligned with proper size mark on size bar.
Roll Pin
Index Line
Lock Screw
Throwout
Lever
Figure 10 – Universal Self-Opening Die Head
11. Tighten clamp lever.
12. If oversize or undersize threads are required, set
the index line in direction of OVER or UNDER size
mark on size bar.
Size Bar
Clamp
Lever
Trigger
Assembly

Publicidad

Tabla de contenido
loading

Tabla de contenido