Descargar Imprimir esta página

Protemp PT-80V-LPC-A Manual De Instrucciones página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

11 mm Screws (6)
Missing Parts? Please Call 800-641-6996 For Assistance
Attaching The Upper Housing
1. Slide Upper Housing straight up and off of
lower housing and remove all packed items
from inside the heater. (See Figure 4)
2. Remove all packaging protecting the heater
during shipping. Retain caps for covering the
inlet connector and regulator hose fro storage.
3. Inspect heater closely for any damage that
may have occurred during shipping. If there is
any damage, return the heater to the place of
purchase.
Figure 4
© 2015, Pinnacle Products International, Inc.
All manuals and user guides at all-guides.com
NEVER LEAVE HEATER UNATTENDED WHILE BURNING,
CONNECTED TO A POWER SOURCE, OR WHILE
®
CONNECTED TO A FUEL SOURCE
Assembly Instructions
What's In The Box
Regulator (1)
4. Attach three (3) screws to the bottom row of
holes in the lower housing. (See Figure 5)
5. Slide upper housing over lower housing,
lining up the four remaining screw holes.
Insert three (3) screws and tighten securely.
(See Figure 5)
NOTE: Save carton and packaging material
for later storage.
Figure 5
5
Convection Heater User's Manual
Upper Housing (1)

Publicidad

loading

Este manual también es adecuado para:

Pt-200v-lpc-a