13
ASSEMBLY
13.1 Initial activities
13.1.1 Delivery content
Please check the product contents (see capture 11.1) immediately after receipt for any eventual
transport damage or missing parts. Claims from transport damage or missing parts must be
placed immediately after initial machine receipt and unpacking before putting the machine into
operation. Please understand that later claims cannot be accepted anymore.
13.1.2 Workplace requirements
The workplace has to fulfill the requirements stated in capture 12.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.
The machine must be placed in a way that at least 0.8m room free space around the machine.
For longer workpieces sufficient additional place before and behind the machine should be
calculated.
13.1.3 Transport
The machine can be transported in package with a forklift.
The machine is very heavy. The machine shall be lifted from crate with
a suitable lifting device only that is certified to be able to carry the
machines load.
13.1.4 Preparation of the surfaces
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine
surface.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.
HOLZMANN MASCHINEN GmbH
The transport and the lifting of the machine shall be performed by
qualified and respectively trained persons only.
www.holzmann-maschinen.at
HOLZBANDSÄGE / MWOOD BAND SAW / SIERRA DE CINTA / SCIE À RUBAN
W A R N I N G
N O T I C E
ASSEMBLY
Seite 34
HBS 700 – HBS 800