Descargar Imprimir esta página

cecotec AIRCLIMA 9000 SMARTFRESH Manual De Instrucciones página 107

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 44
6. Pressure hose
7. Manifold pressure gauge
8. Pressure gauge
9. High pressure valve
10. Low pressure valve
11. Charging hose
12. Vacuum pump
INSPECTIONS BEFORE THE TEST OPERATION
Perform the following inspections prior to the test operation.
Description
Method of inspection
Electrical safety
Check if the voltage of the power supply complies with the specifications.
inspection
Check if there are any wrong or missing connections between the power
lines, signal line and ground wires.
Check whether the earth resistance and insulation resistance comply with
the requirements.
Safety
Confirm the direction and smoothness of the drain pipe. Confirm that the
inspection of
coolant pipe gasket is fully installed.
the installation
Confirm the installation safety of the outdoor unit, mounting plate and
indoor unit.
Confirm that the valves are fully open.
Confirm that there are no foreign objects or tools inside the unit. Complete
the installation of the grille and air inlet panel of the indoor unit.
AIRCLIMA 9000 SMARTFRESH/ AIRCLIMA 12000 SMARTFRESH/ AIRCLIMA 18000 SMARTFRES/
AIRCLIMA 24000 SMARTFRESH/ AIRCLIMA 12000 SMARTFRESH CONNECTED
ENGLISH
107

Publicidad

loading