36" DUAL FUEL RANGE INSTALLATION INSTRUCTIONS
1
Cabinet Construction
To eliminate the risk of burns or fire by reaching
over heated surface units, do not have cabinet
storage space above the range. If there is cabinet
storage space above range, reduce risk by
installing a range hood that projects horizontally
a minimum of 5" (12.7 cm) beyond the bottom of
the cabinet.
Follow instructions for the
type of installation you have
Figure 3: Cabinet construction
1.1
Installation: Cabinet on Both Sides
1.
If range will be installed with a cabinet on both
sides, Draw a center line on the floor between
the cabinets (Figure 3).
2. If back of range will not be flush with the wall
(the location of the outlet may not allow the
range to be positioned against the wall), draw
a line on the floor where the back edge of the
range will be.
3. Install anti-tip device (see "Anti-Tip Installation").
1.2
Installation of screw-in feet
Freestanding appliance are supplied with four
screw-in feet in the internal accessory pack. The
screw-in feet can be adjusted by turning the lower
half clockwise or anti-clockwise.
Center
Line of
Range
Heavy item! This step must be performed by two
persons.
Note: You MUST remove the oven door before
commencing installation.
1.
Open oven door completely, horizontal with
floor.
2. Locking tab up at normal position.
3. Press the locking tab down for removing the
door.
7