Descargar Imprimir esta página

SFA Control Box ZPS 1.3 Manual De Funcionamento página 17

Ocultar thumbs Ver también para Control Box ZPS 1.3:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 35
1. SAFETY
This operating and installation manual
contains important instructions to follow
for the fitting, operation and maintenance
of the Control Box ZPS1.3. Following these
instructions guarantees safe operation and
prevents injury and property damage. Before
fitting and commissioning the installation,
the qualified installer/user concerned must
read and understand all these instructions.
If the instructions of the operation manual
– especially the safety instructions - are
not observed, or in case of unauthorized
modifications or the installation of non-
original spare parts, the guarantee expires
automatically. The manufacturer assumes
no liability for damages resulting from such
behaviour.
IDENTIFICATION OF WARNINGS
Meaning
DANGER
This term defines a high risk of
danger, which can lead to death
or serious injury, if not avoided.
NOTICE
This term characterises dangers
to the machine and its proper
operation.
Warning of a general danger.
The danger is specified by
indications given in the table.
This
dangers associated with the
voltage and provides information
on voltage protection.
2. TRANSPORT, STORAGE, DISPOSAL
2.1 TRANSPORT
• When receiving goods, check the condition of the control
box's packaging.
• In case of damage, note the exact damage and immediately
notify the dealer in writing.
2.2 STORAGE
Conserve the control box in a cool, dark, dry and frost-free site.
2.3 DISPOSAL
The device must not be disposed of as household
waste and must be disposed of at a recycling point for
electrical equipment. The device's materials and
components are reusable. The disposal of electrical
and electronic waste, recycling and recovery of any
form of used appliances contribute to the preservation of our
environment.
3. DESCRIPTION
3.1 APPLICATION
Control Box ZPS1.3 is a control box for water level regulation
by a pump. It is possible to control the operation of the pump
by different level sensors: float switches, dip tube, external
4-20 mA sensors.
Various features are available to signal malfunctions and ensure
proper operation of the system: internal audible signal, four
programmable potential-free alarm switches, pump switch-on
and switch-off delay, monitoring of current consumption and
motor temperature, high water level sensors.
symbol
characterises
In addition to its own operating parameters, the box also records
the duration of operation and the number of times the pump is
started. It also saves alarms that have occurred in a logbook that
can be consulted on the screen.
The control system is operated via 6 short travel key switches,
the program settings are displayed on an LCD display. All
settings are saved so that they are available when the control
system is restarted. The display language can be changed.
3.2 GENERAL CHARACTERISTICS
• LCD display
• Forced start, manual stop or automatic pump operation
• Setting via push button
• 1 confirmation key, 2 parameter selection keys
• Selection menu
• Acoustic signal
• 4 programmable potential-free signal contacts
• Operating hours counter
• Maintenance interval counter
• Pump start counter
• Alarm log storage
• Electronic motor current monitoring
• Programmable delayed start
• Programmable pump delay time
• ATEX mode
• Internal pressure sensor (connected to the dip tube)
• Level indication in cm
• Digital inputs for thermocontactors
• Digital inputs for 3 float switches
• 1 analogic input for 4-20mA transmitter
3.3 TECHNICAL DATA
Operating voltage
Voltage of control box
Power consumption
Pressure range
Delayed start-up
Delay time
Time monitoring
Motor current limitation
Alarms log memory
Maintenance interval counter
Temperature operating range
Dimensions
Max. pre-fuse
Potential-free alarm contact
IP rating
Box material
4. INSTALLATION
DANGER
Electrical connection work performed by an un-
qualified personnel.
Risk of electric shock!
Ö The electrical installation must be carried out by
a qualified electrical professional.
Ö Adjustments and calibrations of the control box,
as well as its commissioning, may only be carried
out by qualified personnel.
Ö All wiring must conform to national standards
for electrical installations.
DANGER
Ö Only carry out the electrical connections after the
final hydraulic connections have been completed.
17
230 V or 400 V/AC/50–60 Hz
230 V/AC/50–60 Hz
approx. 6 VA
0–1 mWs
0–180 sec
0–180 sec
0–300 sec
0,5–14 A
32 memory positions
0–365 days, adjustable
-20 – +60°C
180x254x90 mm
20 A
3 A max.
IP 65
Polycarbonate

Publicidad

loading