EN
5.3 Installation
• If you wish to verify and commission your solar system immediately,
complete the installation when the weather is sunny.
• It is recommended that at least two people participate in the installation.
• Please remember whether connecting or disconnecting Hub 2000 with
AB1000 or AB2000 or SuperBase V or Satellite Battery, solar panels or
Microinverters.make sure SolarFlow is turned off by ways of below .
• Press and hold IOT Button for 6s to shut off SolarFlow.
If battery is SuperBase V / Satellite Battery and still working , then also
hold its Power Button for 3s to switch it off .
5.3.1 Installation Steps Overview
A. Disconnect the solar panel,Microinverter and the home grid
B. Install Hub 2000
C. Install Smart Microinverter
D. Find a place to stack AB1000or AB2000 or SuperBase V or Satellite
Battery.
E. Connect the top one AB1000 or AB2000 or SuperBase V or Satellite
Batteryto the Hub 2000
F. Connect the Microinverter to home grid
G. Connect the solar panels to the Hub 2000
H. Scan the QR code and download the Zendure app. Follow the
instructions of the app to set up device.After 20 minutes, you will get
the SolarFlow power storage system's data on your Zendure app.
Tips:
According to the government's regulations and to ensure safety, the
Microinverter can only start working after connecting to a powered grid
for 5 minutes. To improve the accuracy of the data, the system will verify
and validate it for 15 minutes before showing it on the app.
5.3.2 Installation Tools
Before installation, please check all accessories and prepare the following
tools (tools are not included in the purchase )
Phillips Screwdriver
Electric Drill
5.3.3 Disconnection
Tips:The method of disassembly is subject to the instructions of the
Microinverter, and please confirm the warranty terms of the microinverse
before disassembly.
10
Hexagon Wrench
Marker Pen
Work Gloves
Tape Measure