SET UP & USE
Line up the hole of one side of a 6 (SUPPORT RAIL), then the 7 (CONNECTING RAIL)
with the hole on the exterior side of 5R (UPPER RIGHT BACK VERTICAL POLE).
Secure with 35M (35mm MEDIUM SCREW).
Line up the remaining hole of the 7 (CONNECTING RAIL) with the hole on the
exterior side of 4R (UPPER RIGHT FRONT VERTICAL POLE). Secure with 35M
(35mm MEDIUM SCREW).
Line up the middle hole of the 6 (SUPPORT RAIL) with the hole on the outside of 2R
(LOWER RIGHT FRONT VERTICAL POLE), Secure with 25S (25mm SMALL SCREW).
Line up the last hole of the 6 (SUPPORT RAIL) with the hole on the inside of 1F (Front
Base). Secure with 20M (20mm SMALL SCREW).
NOTE: Follow the same steps to assemble the left side.
35M
7
25S
Page 12
6
20S
20S
4R
2R
6
25S
See next page for detail of each step.
5R
7
35M
3R