OPERATING AND MAINTENANCE MANUAL
SWITCHMATIC SERIES CONTROLLER
PUSH BUTTONS
9. COMMISSIONING (diagram C)
Before commissioning the unit, read the previous sections, especially 'Hydraulic
Installation' and 'Electrical Connection', before starting up the unit:
1. For model SW2 enter the rated current of the pump:
- Press
for 3 seconds.
- The current setpoint in A flashes on the display and LED A lights up.
- Use the and keys
- Press
to validate
2. Switch on the device by pressing
3. Introduce start-up pressure:
- Press
for 3 seconds.
- The start-up pressure flashes on the display and the START LED lights up.
- Use the buttons
- Press
to validate.
www.proindecsa.com / proindecsa@proindecsa.com
PULSATION
From ON state: device OFF.
From OFF state: the device is switched on and the pump is activated until
Pstop.
and the pump is activated up to Pstop.
From any of the configuration modes:
validates the value entered.
From ON state: device OFF.
From OFF state: the device remains in operation until
the until the button is released.
Display Pstart for 3 seconds.
Enter the Pstart configuration.
Displau Pstop for 3 seconds.
Enter the Pstop configuration.
The instantaneous current consumed is displayed on
the screen. If we are already viewing it, we return to the
pressure display.
We enter the input of the nominal current.
and
to set the rated current indicated on the nameplate. See Note 1.
and
to set the start-up pressure from 0.5 to 7 bar (+ version =11 bar).
ACTION
17