Descargar Imprimir esta página

ENAR STELLA Manual De Operación página 52

Torre de iluminación multifunción

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation of the
Lifting Bracket
Installation of the
Mast Assembly
en
18
STELLA
1.
Install the lifting weldment. Secure it with 4 pieces of screws M10X30 and 4 pieces
of Lock Washer D10. 2 from hardware parts (3). Apply locktite 263 and tighten to an
approximate torque of 47Nm.
Note: Considering the safety factor, it is recommended that more than two people install
together.
1.
Remove mast and lamp head from the wooden box.
MULTIFUNCTION FLOODLIGHT TOWER

Publicidad

loading

Este manual también es adecuado para:

5100077095