SMA SUNNY TRIPOWER 60 Instrucciones De Instalación página 34

Ocultar thumbs Ver también para SUNNY TRIPOWER 60:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3  Initial Setup and Start
3. Verify that date and time are correct. If not, set date
and time and continue. See figure 3.5.
Figure 3.5 LCS tool - Verifying date and time
4. A list of inverters identified by the selected
SMA Inverter Manager is shown. See figure 3.6
Make sure that the list of inverters is complete.
Make sure that all inverters are present. It is possible to
continue the configuration of the listed inverters even if not
all inverters are discovered. The undetected inverters can
always be configured later.
34
STP60-10-IA-xx-10
SMA Solar Technology AG
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido