SMA SUNNY TRIPOWER 60 Instrucciones De Instalación página 35

Ocultar thumbs Ver también para SUNNY TRIPOWER 60:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

SMA Solar Technology AG
Figure 3.6 LCS tool - List of connected inverters
5. Select the desired country from the list of options
available for the inverters in the network. See figure
3.7.
Figure 3.7 LCS tool - Select country and grid code
Installation Guide
6. Select the desired grid code from the list of options
available for the selected country. If needed, load a
customer-specific grid code by clicking the "Load"
button. See figure 3.7. The "Create" button is inactive
and cannot be used.
7. The LCS tool prompts for a confirmation of the selected
country and grid code. See figure 3.8. Incorrect
configuration can be changed using the "Back" button
and changing the settings in the previous windows.
3  Initial Setup and Start
STP60-10-IA-xx-10
35

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido