Trip Settings; Compliance - SMA SUNNY TRIPOWER 60 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY TRIPOWER 60:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

SMA Solar Technology AG

5.2 Trip Settings

Figure 5.1 Overvoltage and undervoltage disconnect
Nom. grid
Nominal voltage
Standard
400 V
Range
Nominal voltage:
Standard
480 V
Range
Table 5.3 Standards for voltage trip levels and trip times
Fmin2
[Hz]
Standard
57.00
Range
56.5 to
57.5
Table 5.4 Default frequency trip levels and trip times
INFORMATION
The values apply only to IEEE 1547.
International standards
Efficiency
EC Low-Voltage Directive
Installation Guide
Vmin2
T_Vmin2
Vmin1
[V]
[s]
[V]
200.00
0.16
352.00
160 to
0.1 to 3.0 300 to
240
380
240.00
0.16
423.00
192 to
0.1 to 3.0 360 - 456 0.5 to 3.0 504 -
288
T_Fmin2
Fmin1
[s]
[Hz]
0.16
59.30
0.1 to 3.0 57.0 to
59.8
Test procedure: Performance Test Protocol for Evaluating Inverters Used in
T_Vmin1
Vmax1
[s]
[V]
2.00
440.00
0.5 to 3.0 420 -
480
2.00
528.00
576
T_Fmin1
Fmax1
[s]
[Hz]
10.00
60.50
0.16 to
60.1 to
300
60.9

5.3 Compliance

STP 60 series
EU efficiency, Standard: EN 50530
CEC efficiency, Standard: CEC Directive
Grid-Connected
Photovoltaic Systems (Draft): March 1, 2005
2006/95/EC
5  Technical Data
T_Vmax1
Vmax2
[s]
[V]
1.00
480.00
0.5 to 3.0
440 -
520
1.00
576.00
0.5 to 3.0
528 -
624
T_Fmax1
Fmax2
[s]
[Hz]
0.16
-
0.16 to
60.1 to
3.0
61.0
STP60-10-IA-xx-10
T_Vmax2
[s]
0.16
0.1 to 3.0
0.16
0.1 to 3.0
T_Fmax2
[s]
-
0.1 to 3.0
47

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido