INSTALLATION
WITH
BLOWER (1200 cfm)
1. Install the Duct Plate B (Figure 7) which came
with the internal blower kit, on top of the rangehood
with the holes located closer to the front. Use 9
screws supplied with the blower kit.
FIGURE 7
2. Remove the white plastic covering and Install
the 4 side trim pieces (4-5) to the outside of the
hood using (14) part 9c screws, see the side trim
installation in (Figure 8).
9c
5
4
FIGURE 8
3. Attach the blower bracket divider inside the
hood with the 2 screws into the top of the hood
and 2 screws into the back, all supplied with the
blower kit (Figure 9).
FIGURE 9
10
IB1200
INTERNAL
B
4
5
4. Install the 2 motor kits into the sides of the
blower bracket using the 4 screws supplied with
the motor kit (Figure 10).
FIGURE 10
5. Connect the wire cable D (which is located
Internal 1,200 cfm PRO Blower sku
inside of Kit
). Connect the 6 hole end (A) to the wire
#; IB1200
box and connect the 9 hole end (B-C) to the two
motors (Figure 11).
B) 9 hole end
B) 9 hole end
C) 9 hole end
FIGURE 11
6. Install the 2 dampers (A) on top of the hood
(which is located inside of Kit
PRO Blower sku #; IB1200
the 10" duct transition (E) (which is located inside
Internal 1,200 cfm PRO Blower sku #;
of Kit
IB1200
) and install with four screws (Figure 12).
FIGURE 12
7. Follow step 4 on page 13 to connect ducting,
wiring, and test the electrical connection.
C) 9 hole end
A) 6 hole end
D
A) 6 hole end
Internal 1,200 cfm
). Alternatively, install
E