OPERATING AND MAINTENANCE MANUAL
SOLAR PUMPING KIT
NOTES
•
When the system is powered on for the first time, the delay function is not active and it will start
working directly.
•
If you don't need to use the delay function, leave the slider at the "0" position.
4. SWITCH FUNCTION INSTRUCTIONS SOLAR-BAT
The SOLAR-BAT Switch has three positions: Solar installation, Stop (center) and Battery.
When you are using the installation or the battery, simply move the position of this switch to change
between one mode and another.
BATTERY MODE OPERATING INSTRUCTIONS
1. FIVE FEATURES OF BATTERY MODE
•
The solar installation can allocate energy for the operation of the pump and to recharge the
battery at the same time.
•
Solar installation and battery can provide power for pump operation at the same time.
•
The solar installation can derive the solar energy to recharge the pump if there is enough solar
radiation for this but not for the start of the pump.
•
The pump can work only on battery power.
•
When you want to use the battery it is not necessary to reconnect the cables manually, it is
enough to operate the SOLAR-BAT switch to change between one mode and another.
2. INSTRUCTIONS OF INDICATOR LIGHTS IN BATTERY MODE
Nº
INDICATOR LIGHTS
1
All the lights blink at once
2
"SYS" blinks
3
"SYS" + "PUMP" + "MPPT" flash
www.proindecsa.com / proindecsa@proindecsa.com
(Only for 12V, 24V, 36V or 48V pumps)
The system is getting power
The system starts a self-test
System starts download mode
19
SYSTEM STATUS