Descargar Imprimir esta página

PYD Electrobombas 3TSS Manual De Instalación Y Mantenimiento página 21

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATING AND MAINTENANCE MANUAL
SOLAR PUMPING KIT
NOTES:
In case the water level in the well does not decrease and you do not need to use the well level
probe, jumper contacts COM1 and WH.
The total length of the probe cable is less than 200 m. If you want to increase the cable length,
please make sure the splice connection is complete and it is perfectly insulated and waterproof
to avoid short circuit.
The well level probe must be installed at least 10 cm above the pump suction.
SELECTION OF THE SOLAR INSTALLATION
You can use the following images to help you determine the optimal angle for mounting the panels. If
you are in the northern hemisphere, you should face the panels to the south and tilt them at an angle
equal to your latitude. On the contrary, if you are in the southern hemisphere you should orient them
facing north.
There is a standard position for the entire year. For optimized positions according to the season, you
can refer to the table below.
LATITUDE
STANDARD INCLINATION YEAR
50º
60º
45º
55º
40º
45º
35º
40º
20º
20º
www.proindecsa.com / proindecsa@proindecsa.com
SUMMER INCLINATION
55º
50º
40º
35º
15º
21
WINTER INCLINATION
65º
60º
50º
45º
25º

Publicidad

loading