base we have to extract completely the mobile base. To do this, first of all turn the safety lock placed on the frontal lower right part (in model
Neva, see drawing D18) and on the frontal lower left part (in model Damasco, see drawing D19) with an Allen wrench.
Extract the mobile part, tilt it upwards by the frontal (see drawing D20) and pull back. In this way, the components are separated. You must
foresee a support to leave the equipment at the moment of the extraction.
D18
Placing the frame
Once the installation is finished you will be able to assemble the frame. Please proceed as follows:
Take out the unit and place the frontal, fix it with the lateral screws on both sides of the unit taking care that the flanges
of the frame remain outside (see drawing D21).
6
STARTUP
The ignition of this kind of equipments is automatic, so, please do not put on the burner any kind of material to ignition.
It is forbidden to use liquid substances such as alcohol, gasoline, petroleum or similar products. The
use of this substance leads the loss of warranty.
Before the ignition, follow the next verifications:
-
The electrical cable must be connected to the electrical network (230 Vac) with a socket equipped with
earthing system.
-
The bipolar switch, placed on the rear side of the stove, must be in position I.
-
The pellet tank must be supplied.
-
The combustion chamber must be clean.
-
The burner must be clean and properly placed.
-
The combustion chamber door must be closed correctly.
During the first ignition could happen that the stove has finished the ignition cycle and there is no flame. In this case the stove automatically
starts an alarm state. This happens because the fuel feeder is empty and needs a moment to fill in. To solve this problem start again the stove
(taking into account the previous considerations) until the flame appears.
The stove or insert, at the beginning, must be subject to different start-up cycles so that all materials and the paint can complete different
elastic expansions.
At the beginning, it is possible that you note smoke or smell which are typically produced when metals are subject to high temperatures or
when the paint is still fresh. This paint is boiled at 80º C for a few minutes when construction, but it must exceed for a time the temperature of
200 ºC before the adhesion to the metallic surfaces.
Therefore, it is important to adopt these measures during the ignition phase:
1.
Assure that there is a good air refill in the place where the equipment is installed.
2.
During the firsts ignitions, keep a low power work and the oven lit during at least 6-10 hours continuously.
3.
Repeat this operation at least 4-5 times or more, depending on the needs.
4.
During the first ignitions, you should not place any object on the equipment and, in particular, on lacquered surfaces. Lacquered
surfaces should not be touched while the equipment is heated.
6.1
TUNING OF THE REMOTE CONTROL AND RECEIVER
Your equipment is provided with a remote control and a receiver. If both of them are not tuned the following message will appear l: "CERCA
CAMPO" (see drawing D22).
To tune them, follow the next steps:
-
You must turn off the general power supply switch of the equipment (drawing D23).
-
Press at the same time buttons number 1 and 2 of the remote control until the screen shows "SEGLI UNITA" (see drawing D24).
-
Select the radio frequency channel you prefer: 0, 1, 2 or 3.
-
Restart the general power supply switch of the equipment (drawing D23).
-
At the end, press red button number 3 of the remote control until both devices are connected.
-
When they are tuned the screen will show the original state (see drawing D25).
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS
D19
31
D20
D21
RADIOFREQUENCY SERIES