MB EVO PRO/MB EVO
6 Operation
7 Putting out of operation
8 Maintenance and cleaning
8.1 Replacing wear parts
1 Open the shielding gas cylinder and switch on the power source.
2 Set the welding parameters.
3 Start welding.
NOTICE
• As liquid-cooled cable assemblies start to leak when they overheat, the
cooling unit should continue running for approx. 5 min. after welding.
1 Stop welding.
2 Wait until the shielding gas post-flow time has passed and then switch off
the power source.
3 Close the valve on the shielding gas cylinder.
DANGER
Risk of injury due to unexpected start-up
For the entire duration of maintenance, installation, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power source and close off the gas supply.
• Close off the compressed-air supply and pull the main plug.
WARNING
Risk of burns
The welding torches are heated to a very high temperature during welding.
• Allow the welding torches to cool down.
• Wear the correct protective gloves if necessary.
NOTICE
• Order data and ID numbers for the equipment parts, wear parts and
accessories can be found in the current ABICOR BINZEL price lists for
spare and wear parts. www.binzel-abicor.com
• Use only original ABICOR BINZEL wear parts.
6 Operation
EN - 13