Descargar Imprimir esta página

Commissioning, Operation; Making The Electrical Connection; Functional Check - Festo SPTW-B11R-G14-A-M12 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Commissioning, operation

6.2 Making the electrical connection

The instrument must be earthed via the process connection.
The power supply for the pressure transmitter must be made via an energy-limited electrical circuit per
EN
UL/EN/IEC 61010-1 or an LPS to UL/EN/IEC 60950-1 or class 2 per UL1310/UL1585 (NEC or CEC). The
power supply must be suitable for operation above 2,000 m should the pressure transmitter be used at this
altitude.
Only ever use a power source that ensures a safe electrical isolation of the operating voltage in accordance
with IEC/DIN EN 60204-1. In addition, observe the general requirements for PELV circuits in accordance
with IEC/DIN EN 60204-1. Switching power supply units are permissible, if they ensure a safe isolation as
defined by IEC/EN 60950-1.
Long signal lines reduce the immunity to interference. Ensure that the length of the signal cable is always
shorter than 30 m. In this way you can avoid non−operate currents caused by electromagnetic interference.
Electrical connection
Description
2-wire
Model:
SPTW-. ... A
3-wire
Model:
SPTW-. ... VD
Ingress protection per IEC 60529

6.3 Functional check

The output signal must be proportional to the prevailing pressure. If this is not the case, this may
indicate a damaged diaphragm. In this case, see chapter „8. Faults".
12
Circular connector M12 x 1, 4-pin
U
= 1
B
0V = 3
U
= 1
B
0V = 3
Out = 4
IP 67
The stated ingress protection only applies when plugged in using mating connectors
that have the appropriate ingress protection.
3
4
2
1
Pressure transmitter SPTW

Publicidad

loading