Instructions For Use - EdilKamin MITO IDRO Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 89
1st ignition/test by the Edilkamin authorised Dealer
Commissioning must be done as laid down in the UNI 10683
standard.
This standard indicates the control operations to be carried out
in situ, aimed at ascertaining correct system function.
Edilkamin's Technical Assistance staff (CAT) will also cali-
brate the boiler-stove based on the pellet type used and the
installation conditions (e.g. features of the fl ue).
Edilkamin's Technical Assistance staff (CAT) must commis-
sion the boiler in order for the guarantee to be activated.
The DEALER must also:
- Verify that the hydraulic system is correctly installed and is
equipped with an expansion tank that is suffi ciently large to
guarantee safety.
The presence of a tank within the boiler-stove does
NOT guarantee appropriate protection from thermal
expansion occurring in the whole system.
Therefore the installer must assess whether an ad-
ditional expansion tank is needed, depending on the
type of system installed.
- Connect the electrical power to the boiler and implement a
cold test (to be carried out by the DEALER).
- Fill the system using the fi lling tap (it is recommended not to
exceed a pressure of 1,5 bar).
When fi lling, 'bleed' the pump and the relief tap.
There may be a slight smell of paint the fi rst few times it is
ignited, however, this will disappear quickly.
Before igniting you must check:
• that installation is correct
• the power supply
• that the door closes properly to a perfect seal
• that the combustion chamber is clean
• that the display is on stand-by (time and temperature set).
FILLING THE PELLET HOPPER
the hopper lid opens and closes with a practical click-clack
system. simply apply slight pressure to the front part of the
*
cast iron lid
(Fig. 1).
ATTENTION:
Use the glove supplied when lling the stove whilst it is
running and therefore is hot.
NOTE regarding the fuel.
Boiler-stove is designed and programmed to burn wood pellets
with 6 mm diameter. Pellets are a type of fuel in the form of
little cylinders, made from compacted sawdust, compressed
under high pressure with no adhesives or foreign materials.
They are sold in bags of 15 kg.
For the boiler to function properly, you MUST NOT burn
anything else in it. Using other materials (including wood)
will render the warranty null and void. Such use is detected by
laboratory analyses.
Edilkamin has designed, tested and programmed their boiler-
stoves to guarantee the best performance when pellets with the
following characteristics are used:

INSTRUCTIONS FOR USE

- 48
fi g. 1
P
fi g. 2
V
Attention:
When igniting for the fi rst time, do an air/water purge using the
manual valve (V - fi g. 2) on the front of the top.
The operation must be repeated during the rst days of use
and in the event the plant has only been partially reloaded.
The presence of air in the ducts does not allow for proper opera-
tion.
To facilitate venting operations, the valve is fi tted with rubber
hoses.
- diameter: 6 millimetres
- maximum length: 40 mm
- maximum moisture content: 8%
- calori c value: at least 4100
If pellets with different characteristics are used, the boiler-
stoves must be recalibrated – a similar procedure to that
carried out by the DEALER when the boiler is ignited the fi rst
time. Using unsuitable pellets may: decrease effi ciency; cause
malfunctions; stop the boiler-stove from functioning due to
clogging, dirt on the glass, unburnt fuel, etc.
A simple, visual analysis of the pellets may be carried out:
Good quality: smooth, uniform length, not very dusty.
Poor quality: with longitudinal and transverse cracks, very
dusty, various lengths and mixed with foreign matter.
-
*

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido