GASPARDO PA1 Empleo Y Mantenimiento página 78

Ocultar thumbs Ver también para PA1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ENGLISH
INTERVAL
EVERY 50 WORKING HOURS
EVERY PERIODICALLY
EVERY FIVE YEARS
SETTING ASIDE
If these operations are done carefully, it will be to the total advantage of the user because when work is recommenced, he will nd
the equipment in perfect conditions.
G
g. 506
g. 507
78 - EN
USE AND MAINTENANCE
- Grease the row marker arm pin (Fig. 507).
- Check the oil level in the gearbox and top up to level (1, Fig. 504) whenever necessary
using the same type of oil (SAE 10W) whenever possible.
- Check the pressure of the seed drill tyres (see «3.1 Technical Data»).
- To replace all the tubes of the hydraulic systems.
At the end of the season, or if a long period of rest is for seen it is advisable:
1) Carefully empty all the seed from the hopper and distribution assÕy (see cap 4.12.1).
2) Clean the equipment, the tank and the metering unit especially, with a large amount of water.
Then, dry it using jets of air. Clean the electrical components only with a dry cloth.
3) Carefully check worn or damaged parts and replace if necessary.
4) Check the state of wear of the transmission chains and toothed wheels. Replace damaged
or worn out parts, if required. Use solvent to clean the transmission chains, the toothed
wheels and the chain stretchers. Lubricate with mineral oil (SAE 80W/90) when dry.
5) Make sure that the metering unit can rotate without excessive efforts. Check the bearings,
if necessary.
6) Tighten all screws and bolts.
7) Apply protecting oil to all unpainted parts (Fig. 508).
8) Protect the equipment with a (nylon) cover.
9) Then put it in a dry place, do not move it and where it is out of reach of un authorized people.
H
TYPE OF WORK
g. 508
cod. G19504090

Publicidad

Tabla de contenido
loading

Tabla de contenido